Send Message
Home News

company news about Pay Attention When Installing The Cable Tray

Certification
China Cangzhou Best Machinery Co., Ltd certification
China Cangzhou Best Machinery Co., Ltd certification
Customer Reviews
i am happy with Cangzhou BEST Machinery Co.,Ltd. very professional and reiable factory. They offer good quality machine and good sales serverice, look forwarder to cooperate with them again.

—— Moyo

Cangzhou BEST Machinery co.,ltd's machine very good, and production is fast, delivery fast. very turstfull company.

—— Octavio

Thanks for your kindly hospitality. Your company is very professional , we will have nice cooperation in the near future.

—— Cristian

very good company.through very good communication all problems solved, satisfied with my purchase.

—— Spence

very professional factory, realiable, happy with them

—— Samuel

good sales service, delivery time is fast.good communication.

—— Ali

I'm Online Chat Now
Company News
Pay Attention When Installing The Cable Tray

A few notes about the installation of cable trays:
(1). Visual inspection
When the cable tray enters the construction site, the following materials should be submitted to the factory, the product quality certificate, the periodic inspection report of the provincial and municipal quality supervision station, and the relevant technical identification documents. The thickness of the cable tray plate should meet the relevant requirements. The coating surface of the hot-dip galvanized cable bridge should be uniform without defects such as over-burning, ash hang, and local ungalvanized. Electrostatic spraying should be flat, smooth, uniform, skinless, no bubbles, blister bridge itself should be flat, without distortion, the inner wall should be smooth, no burrs, the weld surface of the bridge should be uniform, no leakage, cracks, burn-through, etc. defect.
(2). Installation position of cable bridge
When the bridge is laid horizontally, the height from the ground should generally not be less than 2.5m. When laying multiple layers of the bridge, in order to dissipate heat, maintain and prevent interference, a certain distance should be left between the layers of the bridge. When the cable bridge is laid in parallel with various pipelines, its clear distance should meet the relevant regulations.
(3). Installation of support and hanger
The quality of the support and hanger of the cable bridge should conform to the current relevant technical standards. When the cable bridge is laid horizontally, the support span is generally 1.5 ~ 3m. When trying vertical laying, the fixed distance should not be greater than 2m. The horizontal height difference between the two adjacent bridge support arms Should not be greater than 10mm, the vertical deviation of the vertical centerline of the two adjacent bridge support arms should not be greater than 20mm.

 