Product Details:
|
Name: | Auto Change Size C Purlin Machine Width 80-300mm Roll Forming Making Machine | Condition: | New |
---|---|---|---|
Color: | As Your Request | Customized: | Yes |
Material: | Galvanized | Power: | 18.5kw |
Voltage: | 380v | Warranty: | 2 Years |
Cutting Type: | Hydraulic | Cutting Blade: | Cr12 Steel |
High Light: | c channel roll forming machine,steel frame roll forming machine |
Auto Change Size C Purlin Machine Width 80-300mm Roll Forming Making Machine
Working Flow:
Specifications:
No. | Item | Description |
1 | Suitable material | Strip steel |
2 | Working speed | 12-15m/min not including punching and cutting |
3 | Main motor power | 18.5 kw with cycloidal reducer |
4 | Hydraulic station power | 7hp |
5 | Electrical control system | PLC control system with famous brand |
6 | Thickness of material | 1.5-3mm |
7 | Shaft diameter | 80mm |
8 | Roller station | 13 stations |
9 | Material expand axis | 200-600mm |
10 | Dimension | 11mX1.3mX1.35m |
11 | Driving mode | Chain |
12 | Electric tension | 380V 3phase 50HZ or as the customer's requirements |
13
|
Material of roller | High grade 45# forged steel plated with hard chrome plating |
14 | Material of cutting | Cr12 mould steel with quenched treatment |
15 | Working time | Can be 24 hours |
16 | Workers | 1-2 only |
Machine photos:
Optional:
Sales terms:
30% as deposit ,balance payment after inspection while before delivery.
30 days after the 30% deposit.
Nude packing in the 40 feet container ,fixed well with oil rope, control cabinet and all the accessories with waterproof.
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
If installation is needed, the seller will dispatch a technician to the buyer’s factory abroad to assist regulating the machine with charge free. The buyer should assist the seller to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Position the machine in the buyer’s factory.
Prepare necessary electric wiring.
Prepare material of trial running.
Provide labors for assistance and installation during installation.
FAQ:
1. what is your guarantee period?
Guaranteed against malfunctions due to manufacturing defects for 18 months from the date of loading.
2. Do you provide training for my workers?
The machine has been installed and tested well before shipping. It is easy to operate.
Normally speaking, our customer follows the instruction book and can operate the machine well.?
You can also come to our factory to check the machine and learn how to operate before shipping. It only needs 2 hours and you can operate well.
3. I do not know about the machine and do not know how to install it. Can you install the machine in my factory?
If you need us to send engineers to your factory, you will pay for the travel expense such as visa, round tickets, hotel, food Salary of 100 USD per day per person (from departure from our factory, until we are back to our factory). You also need to take care of his safety.
4. What is included in the machine?
The process for work: decoiler→feeding→roll forming→measuring length→cutting to length→product to stand
The whole line includes a manual decoiler, roll forming machine and product stand. when you get the machine in your factory, you just need to do following 3 things, and then you can start working.
a. Put the machine on the flat level ground.
b. Inject gear oil and hydraulic oil.
c. Connect 3 phase electric wire.
Contact Person: Anne Song
Tel: +8618045013499